'Alien and incongruous' - Plans for huge solar farm in 'unspoilt landscape' near Haughmond Hill thrown out by inspector

A company hoping to build a solar farm near Haughmond Hill has had its appeal thrown out by a Government inspector.

Slough-based Opdenergy UK 10 Limited revealed its plans to build a solar farm on a 61-acre plot of land to the west of Haughmond Quarry in April last year.

The company had said the proposal, known as 'Uffington Solar Farm', would generate enough electricity to supply 7,500 homes.

Plans had been drawn up "in conjunction with a willing landowner" to accommodate sheep grazing beneath and between the rows of solar panels, which would have maintained the agricultural use of the site.

But the proposal proved controversial, attracting 21 objections from local residents, community groups and the local parish council.

Many of the objections centred upon the potential impact the site would have on the picturesque site - which one objector described as having "spectacular views of sweeping countryside and an unspoilt landscape".

Concerns were also raised about the development due to its vicinity to the historic Grade I listed Haughmond Abbey and the Iron Age Hillfort on Haughmond Hill.

In June 2024, Shropshire Council refused permission for the solar farm to be built, citing the loss of historic landscape as well as the potential impact on skylarks and the possibility of construction noise.

Disagreeing with the local authority, the developers appealed the decision to the Government Planning Inspectorate, which has now sided with the council and thrown out the appeal.

In a report, Inspector Jonathan Bore determined the solar farm would "appear as an alien and incongruous feature" in relation to the historic abbey.

He added: "A slice of the solar farm would appear behind the abbey walls and would be visible through the large west-facing abbey window. It would be an intrusive and disruptive element in the attractive panorama and would be harmful to the abbey’s setting."

While the inspector determined the development would generate little noise, it was also determined that skylarks were likely to use the site for breeding and there was "insufficient certainty" that a planning condition could prevent disruption.

He concluded: "It is recognised that there is an urgent need for new energy generating capacity and renewable energy in particular.

"However, it is important to ensure that proposals for renewable energy are located in suitable places in the landscape and are sensitively sited in relation to heritage assets."

Related topics:

Comment Guidelines

Iconic Media encourages reader discussion on our stories. User feedback, insights and back-and-forth exchanges add a rich layer of context to reporting. Please review our Community Guidelines before commenting.

Local news you can trust
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice