Five options put forward for future of Shrewsbury's swimming pool


Five options have been put forward for the future of Shrewsbury's swimming pool. The public will be able to have their say within weeks.
The Quarry swimming centre could be spruced up, given a major refurbishment, or completely rebuilt under proposals put forward by Shropshire Council.
Further options include building new facilities on a new site or creating a new pool at an existing sports site.
- "Spruce up" the current pool
- Major refubishment of the current pool
- Rebuild the current pool
- Build a completely new pool at a new site
- Build a completely new pool at an existing sports site
Council chiefs have extended public consultation by an extra month due to the high level of public interest, meaning people will have four months to make their views known. The consultation period will begin at the end of this month.
The five options were revealed by George Candler, the council officer leading a review of Shrewsbury's swimming provision, at the annual town meeting last night.
He said the public will be asked if they would like to see the Quarry pool refurbished, where the centre would have a "lick of paint" and some other improvements, or whether they would back the same pool with a more extensive renovation.
A third option will be for a complete rebuild on the Quarry site, the fourth to build a new centre at a completely new site, and the final consideration will be whether to build a new pool "alongside existing sports provision".
Options one and two would see the Quarry retain four pools while the other three would see the creation of a main pool – expected to be eight lanes and 25 metres long – along with a learner pool, a 50 station fitness suite, and room for 250 spectators.
The review has also considered whether it would be possible to build a 50 metre pool, diving boards, and flumes.
Mr Candler said: "The Quarry at the moment can host galas and you need a minimum number of seats to hold events at competition level."
He told the audience that the consultation period had been extended from the usual three-month period to four months because of the "level of interest this has generated to date".