Pig manure fertiliser tower approved at Newport farm as resident calls for controls

Pigs on a pig farm placeholder image
Pigs on a pig farm | Gareth Fuller/PA Wire

Concerns were raised over smells, noise and working hours

A new resident's concerns about smells from a proposed 5.63 metre (18 ft) tall tower to hold pig manure fertiliser at a Shropshire farm were raised with planners.

The resident, who lives less than half a mile away from New House Farm, in Chetwynd, near Newport, said their life was already being affected by drifting local odours.

They told planners that the plans posed distinct risks through noise, odour, and hours of operation that must be strictly mitigated.

"As a new resident to the area there is a frequent strong odour outside at no specific times already.

Pigs on a pig farmplaceholder image
Pigs on a pig farm | Gareth Fuller/PA Wire

"I am unsure if this is related to existing farming but it already detrimental to my standard of living and limiting my ability to go outside and enjoy my outside space or invite guests due to the strong odour."

The resident called for odour management plan to be approved by environmental health, a noise assessment to be carried out and restrictions on the farm's hours of operation.

"To protect the peace and evening amenity of local residents, it is vital that the operational hours of this facility are strictly controlled," they wrote.

The resident called for the farm activities to be confined to standard daytime working hours.

"Given our proximity to the site, these measures are entirely reasonable and necessary to ensure the development complies with local planning policies regarding the protection of residential amenity."

Planners at Telford & Wrekin Council were told by agent Roger Parry & Partners that the tower was needed by the 'successful' farm which finishes pigs and generates renewable power from their manure.

It uses the pig droppings to create power. A by product of the anaerobic digestor energy production process is slurry digestate which is stored before being used at particular times of the year as fertiliser on arable fields.

The 22.836 metre diameter metal juniper green tower is needed to ensure the farm is in keeping with the latest pollution regulations, the agents told planners. There would not be an increase in livestock numbers.

Council planners noted that the tower is to support the existing anaerobic digestor and is not to facilitate an increase in waste processing above the already permitted amount.

"Officers do not consider that the proposal requires any additional information in the way of an odour management plan or a noise assessment and, as it is to support the existing use," planners wrote.

"The proposal is on a working farm which operates with no restrictions to the working hours.

"As this development is to support the existing use and is not to increase the activities on the site, it is not considered appropriate to impose hours of working."

Related topics:

Comment Guidelines

Iconic Media encourages reader discussion on our stories. User feedback, insights and back-and-forth exchanges add a rich layer of context to reporting. Please review our Community Guidelines before commenting.

Local news you can trust
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice